The ATK headquarter facility is a 110,000 square foot Class-A office project that was completed in April, 2008. The $30 million project was developed on a seven acre parcel in Eden Prairie, Minnesota. The building was initially designed as a speculative project, but was developed as a single-user built-to-suit facility for ATK. The building features 3½ stories of office space in addition to amenities that include a café, fitness center, and conference center. |
|
|
• |
The project is environmentally friendly and includes indirect lighting, the extensive use of recycled products throughout, rain gardens, and underground storm water detention. The building also features a two-story atrium lobby and the extensive use of natural materials that include Hickory wall treatments, Douglas Fir flooring, and the use of taconite stone accents throughout. The project site includes a 120-stall parking deck, 30 climate controlled executive parking stalls beneath the building, and extensive landscaping. |